Filings show rationing at lasers, not at silicon photonics wafers

Laser and InP supply is where AI optics suppliers ration output, and photonic test capacity is tightening. Silicon photonics wafer demand is surging too, but Tower reports its buildout ahead of schedule, not allocation.

Status

Review
Research review passed · R3, recorded 2026-11-18
Evidence read to
2026-11-18
Next update
Due by 2026-12-17
Tracked readings
4 variables · next reading due 2026-12-10
Sources
17 sources: 16 on exchange or regulator sites, 1 on company or other sites · a hash is kept for every oneThis pack uses SEC filings and filed exhibits, TWSE and TPEx open data and one Taiwan annual report. Figures that exist only on calls or issuer sites are left out.

What changed

Newest first. A reading is judged only against this Pack's own bars; one period settles no test.

  1. · Revision R3 · 3 facts added

    H1 (core): October revenue at both laser epi suppliers watched was at or above the 3Q26 high, our bar. VPEC edged past its August high by NT$277k; LandMark exceeded its 3Q26 high. Both are company-wide proxies, and the view's test waits for Lumentum's December-quarter 10-Q.

    H2 (supporting): No new reading. FormFactor's next Systems revenue comes with its 10-K, due by 2027-02-24.

    H3 (risk): No new reading. Tower's next statement comes with its 4Q26 results in February 2027.

  2. · New reading · Visual Photonics Epitaxy (2455) monthly revenue, 2026-10: NT$471.2M (+4.9% vs 2026-09)

    H1 (core): supports it. At or above the 3Q26 high, our bar: upstream epi demand keeps rising. A company-wide proxy.

    Source

  3. · Revision R2

    H1 (core): Unchanged, and it now states where value moves if it holds: optical components, on the facts that a laser maker took a customer capacity reservation and that laser chips led its Components growth. Two bars now read "at or above" to match their conditions.

  4. · New reading · LandMark Optoelectronics (3081) monthly revenue, 2026-10: NT$570.1M (+5.5% vs 2026-09)

    H1 (core): supports it. At or above the 3Q26 high, our bar: laser epi growth continues.

    Source

  5. · First published as R1 · 16 facts added

What each read bears on

The chain positions this Pack names, and the reported lines its tracked variables feed. A chain position is a group of companies, not one company.

  1. H1 (core) Laser and InP supply is the AI optics input that suppliers ration now: a laser maker reports allocating supply and taking customer money to reserve capacity, an InP substrate maker says demand outpaces supply, and Coherent is still expanding InP output.

    If it holds: Network: optical component gains

    Shows up in: Visual Photonics Epitaxy (2455) monthly revenue. Feeds company revenue; reported as the revenue is earned.

    Shows up in: LandMark Optoelectronics (3081) monthly revenue. Feeds company revenue; reported as the revenue is earned.

  2. H2 (supporting) Photonic test capacity is tightening behind lasers: FormFactor's Systems revenue rises on its photonics test platform while the company moves capacity to it and says it is nearing its capacity limits. No filing reports test allocation.

    If it holds: not stated in this Pack.

    Shows up in: FormFactor Systems segment revenue. Feeds segment revenue, 21.2% of company revenue in FY2026-Q3; arrives with the quarterly statements.

  3. H3 (risk) Silicon photonics wafer demand is surging too, so wafers could become the rationed link: today Tower, the one foundry here that comments on capacity, reports its buildout ahead of schedule, not allocation.

    If it holds: not stated in this Pack.

    Shows up in: Tower Semiconductor statement on silicon photonics demand and capacity. Feeds capacity and supply, not revenue; arrives before the revenue is reported.

Full research and evidence · 3 reads · 17 sources

R3 · as of 2026-11-18 · fresh until 2026-12-17 · 3 hypotheses · 19 claims · 17 sources

This pack uses SEC filings and filed exhibits, TWSE and TPEx open data and one Taiwan annual report. Figures that exist only on calls or issuer sites are left out.

The author has not disclosed whether they hold the securities discussed. No issuer paid for this research.

Resolved
0 confirmed · 0 missed · 22 unsettled
Freshness
Current
Sources
17: 16 on exchange or regulator sites, 1 on company or other sites
Corrections
History unavailable
History
1 edition

Our read

What we think the evidence means. Each read names what would prove it wrong.

  1. H1 Laser and InP supply is the AI optics input that suppliers ration now: a laser maker reports allocating supply and taking customer money to reserve capacity, an InP substrate maker says demand outpaces supply, and Coherent is still expanding InP output.

    Low confidence

    Wrong if: Lumentum's 10-Q for the quarter ending December 2026 no longer says demand is outpacing supply or that it allocates supply, or a Coherent or Lumentum filing says laser supply has caught up with demand. · Due 2027-02-10 · Open

    Limit: One issuer states allocation; the others show expansion, which can mean a shortage or the end of one. Taiwan laser epi revenue is a company-wide proxy, and none of this is shown to be CPO demand.

    Rests on: E1 · E2 · E3 · E4 · E12 · E13 · E15 · E16

  2. H2 Photonic test capacity is tightening behind lasers: FormFactor's Systems revenue rises on its photonics test platform while the company moves capacity to it and says it is nearing its capacity limits. No filing reports test allocation.

    Low confidence

    Wrong if: FormFactor Systems revenue does not exceed US$59.452 million, its 3Q26 level, in either of fiscal 4Q26 and 1Q27. The bar is ours. · Due 2027-05-06 · Open

    Limit: Systems is a segment, not CPO test revenue, and FormFactor gives no Triton figure. The capacity remark is company-wide. The 3Q26 level as a bar is EquityLayer's own judgment, not a FormFactor target.

    Rests on: E6 · E7 · E8

  3. H3 Silicon photonics wafer demand is surging too, so wafers could become the rationed link: today Tower, the one foundry here that comments on capacity, reports its buildout ahead of schedule, not allocation.

    Low confidence

    Wrong if: Tower or GlobalFoundries reports in a filing that it is allocating silicon photonics capacity or cannot meet silicon photonics demand; a risk-factor list does not count. · Due 2027-02-28 · Open

    Limit: Tower's figure is a target and mixes pluggable, NPO and CPO. GlobalFoundries makes no capacity statement. Silicon photonics customers also prepay for minimum capacity, so the difference from lasers is what the issuers report, allocation versus expansion, and it rests on one statement from each side.

    Rests on: E9 · E10 · E11

Evidence

  • E1 Lumentum's 10-Q for the quarter ended 2026-09-26 says AI and cloud demand is outpacing its current supply and has required decisions on supply allocation. Its 10-K for the year ended 2026-06-27 says the same.

    Management claim · Limit: A company statement, not a measure of the gap. It does not say which products are allocated or for how long.

    Sources: Lumentum Holdings, Form 10-Q (SEC) (2026-11-03) · Lumentum Holdings, Form 10-K (SEC) (2026-08-17)

    Supports: H1

  • E2 In September 2026 Lumentum signed a manufacturing capacity reservation agreement under which a customer committed to pay in two installments. The first, US$100.0 million, became due on signing and is booked as an accrued receivable with an offsetting non-current contract liability.

    Reported fact · Limit: The customer, the second installment and the products covered are not disclosed.

    Sources: Lumentum Holdings, Form 10-Q (SEC) (2026-11-03)

    Supports: H1

  • E3 Lumentum's Components revenue was US$754.2 million in the quarter ended 2026-09-26, up US$375.0 million from US$379.2 million a year earlier. The 10-Q attributes 66% of that growth, about US$247.5 million, to laser chip and laser assembly shipments.

    Derived value · Limit: The 66% is the company's attribution and covers intra-data center, data center interconnect and long-haul demand, not CPO alone.

    Sources: Lumentum Holdings, Form 10-Q (SEC) (2026-11-03)

    Supports: H1

  • E4 Coherent's results presentation, filed as Exhibit 99.2 to its 2026-11-04 Form 8-K, says its internal InP output capacity doubled year on year in the September 2026 quarter, one quarter ahead of plan, and is on track to more than double again by the end of calendar 2027. It also says customer orders increasingly extend into calendar 2028.

    Management claim · Limit: No capacity unit, base or utilization is given. Adding capacity is also how a shortage ends, so this cuts both ways.

    Sources: Coherent, Exhibit 99.2 to Form 8-K (SEC) (2026-11-04)

    Supports: H1

  • E5 On 2026-11-02 Applied Optoelectronics signed a five-year supply framework agreement and an annual purchase contract with an unnamed supplier for a key raw material used in certain products. The annual contract allows purchases of up to about US$194.4 million and requires prepayments of up to US$40.0 million, US$20.0 million of it in 2026. Delivery depends on the supplier obtaining Chinese export approvals, and quantities are limited to what is approved.

    Reported fact · Limit: The 10-Q names neither the supplier nor the material and gives no wafer quantity, so this pack does not treat it as a laser or InP input. No prepayment had been made at filing. The agreement is disclosed in the 10-Q's subsequent-events note; no 8-K for it was found.

    Sources: Applied Optoelectronics, Form 10-Q (SEC) (2026-11-05)

  • E6 FormFactor's Systems segment revenue was US$27.887 million in fiscal 1Q26, US$48.547 million in 2Q26 and US$59.452 million in 3Q26. 3Q26 was up 22.5% from 2Q26 and up 63.8% from US$36.296 million in 3Q25.

    Derived value · Limit: A segment, not CPO test revenue: it also holds probe stations, thermal and cryogenic systems. The 1Q26 dip coincided with legacy probe stations giving way to Triton.

    Sources: FormFactor, Form 10-Q (SEC) (2026-11-03) · FormFactor, Form 10-Q (SEC) (2026-08-04) · FormFactor, Form 10-Q (SEC) (2026-05-05)

    Supports: H2

  • E7 FormFactor's 10-Qs attribute the Systems increase primarily to Triton, which the 2Q26 10-Q calls a high-volume co-packaged optics testing solution and the 3Q26 10-Q a high-volume photonics testing solution. The 3Q26 10-Q says legacy revenue fell as manufacturing capacity and customer demand shifted toward Triton, and the 3Q26 results release says Systems grew more than 20% sequentially on higher demand for co-packaged optics.

    Management claim · Limit: No Triton revenue figure is given, and cryogenic and thermal systems also rose in 3Q26. The wording moved from CPO to photonics between the two 10-Qs.

    Sources: FormFactor, Form 10-Q (SEC) (2026-11-03) · FormFactor, Form 10-Q (SEC) (2026-08-04) · FormFactor, Exhibit 99.1 to Form 8-K (SEC) (2026-10-28)

    Supports: H2

  • E8 FormFactor's 3Q26 results release says productivity gains from its existing manufacturing footprint are moderating as it approaches capacity limits. Its 10-Q says production at its new Farmers Branch, Texas site began late in 3Q26 and ramps through fiscal 2027.

    Management claim · Limit: Company-wide. Most FormFactor revenue is probe cards for logic and DRAM, so this does not show where photonics test capacity alone stands.

    Sources: FormFactor, Exhibit 99.1 to Form 8-K (SEC) (2026-10-28) · FormFactor, Form 10-Q (SEC) (2026-11-03)

    Supports: H2

  • E9 Tower Semiconductor's 3Q26 results release, filed as Exhibit 99.1 to a 6-K on 2026-11-02, targets an annualized silicon photonics revenue run rate of US$1.1 billion in 4Q26, five times its 2025 silicon photonics revenue. It says its capacity investments are progressing ahead of schedule and customer contracts are being extended through 2029.

    Management claim · Limit: A target, not a result. Tower does not split silicon photonics revenue between pluggable, NPO and CPO uses.

    Sources: Tower Semiconductor, Exhibit 99.1 to Form 6-K (SEC) (2026-11-02)

    Supports: H3

  • E10 The same Tower release lists among its risks SiPho customer prepayments received for certain minimum capacity commitments, and over-demand for its foundry services that could create bottlenecks and extend cycle times.

    Management claim · Limit: A risk list, not a report that allocation is happening. It does show that silicon photonics customers also prepay to secure capacity.

    Sources: Tower Semiconductor, Exhibit 99.1 to Form 6-K (SEC) (2026-11-02)

    Supports: H3

  • E11 GlobalFoundries' 3Q26 report on Form 6-K says Communications, Infrastructure & Data Center manufacturing revenue rose 80.6% year on year, driven by data center networking applications that use SiPh and SiGe technologies.

    Reported fact · Limit: No silicon photonics figure is given, SiGe is counted with it, and the report makes no statement on silicon photonics capacity or allocation.

    Sources: GlobalFoundries, Form 6-K quarterly report (SEC) (2026-11-04)

    Supports: H3

  • E12 In the 2026 outlook of its 2025 annual report, VPEC expects demand for its CW laser transmitter products to double from the prior year, and says it will add equipment and is evaluating buying land to build a plant.

    Management claim · Limit: An outlook, not a 2025 result: VPEC's 2025 revenue rose 4.29%. No figures and no CPO link. VPEC calls itself the largest GaAs epitaxy maker; the report does not say whether its CW laser epi is InP.

    Sources: Visual Photonics Epitaxy (VPEC), 2025 annual report (2026-04-10)

    Supports: H1

  • E13 VPEC's monthly revenue in the TWSE table was NT$422,106k in July, NT$470,904k in August and NT$449,063k in September 2026, a 3Q26 range of NT$422,106k to NT$470,904k. Its August note says customer demand increased.

    Reported fact · Limit: Company-wide revenue across photodiode, VCSEL and laser epi, not laser revenue alone.

    Sources: Taiwan Stock Exchange open data (t187ap05_L), August 2026 table (2026-09-13) · Taiwan Stock Exchange open data (t187ap05_L), September 2026 table (2026-10-11)

    Supports: H1

  • E14 None of the filings read states what share of laser, InP, silicon photonics wafer or photonic test demand comes from CPO, as opposed to pluggable modules.

    Unknown · Limit: A term search and reading of the cited filings, not every filing by these issuers. Call transcripts and IR-only slides were not read because their rights are on HOLD.

    Sources: Lumentum Holdings, Form 10-Q (SEC) (2026-11-03) · Coherent, Exhibit 99.2 to Form 8-K (SEC) (2026-11-04) · Applied Optoelectronics, Form 10-Q (SEC) (2026-11-05) · FormFactor, Form 10-Q (SEC) (2026-11-03) · Tower Semiconductor, Exhibit 99.1 to Form 6-K (SEC) (2026-11-02) · GlobalFoundries, Form 6-K quarterly report (SEC) (2026-11-04)

  • E15 AXT's revenue was US$73.4 million in 3Q26, against US$47.6 million in 2Q26 and US$28.0 million in 3Q25, and its GAAP gross margin was 56.0% against 44.9% in 2Q26.

    Reported fact · Limit: Company-wide: AXT also sells GaAs and germanium substrates and raw materials, and the release gives no indium phosphide revenue figure.

    Sources: AXT, Exhibit 99.1 to Form 8-K (SEC) (2026-10-29)

    Supports: H1

  • E16 AXT, an indium phosphide substrate maker, says its record 3Q26 revenue was driven by exceptionally strong customer demand for indium phosphide and that it surpassed its 2026 goal of doubling indium phosphide capacity. Announcing a financing of at least RMB 1.91 billion for its China subsidiary Tongmei, it says demand for indium phosphide wafers is outpacing supply. Both filings list the receipt of export permits for its indium phosphide substrates as a risk.

    Management claim · Limit: Company statements with no split by end use; indium phosphide also serves telecom and other optics. AXT's substrates are made in China, so supply depends on Chinese export permits.

    Sources: AXT, Exhibit 99.1 to Form 8-K (SEC) (2026-10-29) · AXT, Exhibit 99.1 to Form 8-K (SEC) (2026-10-28)

    Supports: H1

  • E17 VPEC's October 2026 revenue in the TWSE table was NT$471,181k, up 4.9% from September and 32.7% from October 2025.

    Reported fact · Limit: Company-wide revenue across photodiode, VCSEL and laser epi, not laser revenue alone. The remarks column is blank.

    Sources: Taiwan Stock Exchange open data (t187ap05_L), October 2026 table (2026-11-16)

  • E18 LandMark's October 2026 revenue in the TPEx table was NT$570,114k, up 5.5% from September and 183.0% from October 2025.

    Reported fact · Limit: Company-wide revenue. It does not separate CPO from pluggable silicon photonics.

    Sources: Taipei Exchange open data (mopsfin_t187ap05_O), October 2026 table (2026-11-11)

  • E19 LandMark's October 2026 note in the TPEx table says data-center product shipments rose from a year earlier.

    Management claim · Limit: It does not separate CPO from pluggable silicon photonics.

    Sources: Taipei Exchange open data (mopsfin_t187ap05_O), October 2026 table (2026-11-11)

Follow it from your agent: create_research_follow {"pack_id":"cpo-laser-inp-test-bottleneck"}. Your agent checks again on 2026-12-17 and tells you when a new version is out. Connect your agent